Master Scheduler
Indexed description
Summary:
The “Master Scheduler” will be based in GDL North, reporting to Production planning Manager
Responsible for working with the materials and planning teams in order to ensure on-time and efficient deliveries of final product, with zero downtime
Responsibilities:
- Create daily production schedules.
- Supervise that deadlines are met.
- Ensure efficiency in scheduling with CTB (Clear to Build) utilization.
- Liaise between the Material Account Manager and Program Teams on demand management.
- Work closely with production personnel on accountabilities and productivity issues.
- Plan efficient transaction of process with production personnel to ensure zero downtime.
- Ensure smooth transaction of manufacturing process to raw materials.
- Develop strategies and liaise with operational teams on capacity & equipment utilization.
- Work closely with operations to ensure smooth flow from raw material to final goods stage.
- Use knowledge and experience of process flow to provide a useful resource to Materials on ERP and business system issues.
- Provide training to staff members as required.
- Report key metrics as required.
- Typically requires a Bachelor’s degree, preferably in Engineering or equivalent.
- Typically requires a minimum of 5 years of related experience.
- Advanced Excel proficiency.
- Advanced English.
- Knowledge of Lean Manufacturing (4Q’s, 8D’s, 5S, etc.).
- Preference for experience with BAAN, FlexFlow, and Kinaxis.
- Experience in creating and overseeing production plans.
- Knowledge of the electronics industry (SMT, PTH, etc.).
- Pantry vouchers
- Saving Fund
- Christmas bonus
- Holiday bonus
- Medical Insurance
- Life Insurance
- Site
Create a free Caio profile to unlock more results and save your role and location preferences.
Unlock free search